Plan QHSE

The quality plan is an internal document whose purpose is to set up an environmental management system through waste management, the proper maintenance of the port and the maintenance of PPE, but also to raise awareness in the Tools box meeting. This system guarantees compliance with technical requirements. In addition, it ensures compliance of the execution process with the requirements specified in each works contract. The personal safety policy and the associated actions aim to: prevent accidents and near misses. The Single Assessment Document Occupational risks, identifies all the risks with levels of severity and frequency associated with each job in the company. This document is updated each year in conjunction with the CHSCT. Apply the general principles of prevention, in particular assess the risks that cannot be avoided and take collective protection measures and give them priority over individual protection measures. and conduct training such as prevention against falls from height, electrical risk, handling of loads. Establish and monitor the authorizations of technicians (work at height, electrical work). Identify and analyze the risks of on-site operations (works or maintenance) during Joint Inspection visits and define security measures through the establishment of a prevention plan. The rules of the prevention plan must be applied by the subcontractors.

We present to you some digital files allowing you to establish a good functioning in terms of communication and HSE prevention, these are :

- Checklist for welcoming and providing information on the safety of site personnel
- Corrective and preventive action sheet
- Additional QHSE audit related to fire works
- Example of Operational Risk Analysis used in the context of a project